As part of the greenfield project to build the new suburb of Taylor – located adjacent to Horse Park Drive between Casey, Moncrieff and Jacka – JRC was engaged to install street lighting for Stage 3.
Following initial construction works for Taylor 3 involving roads, footpaths, kerbs and topsoiling, Stage 3 incorporated utility services such as power, gas and telecommunications. JRC installed a full street lighting package to meet the design specifications throughout the entire third section of the estate development.